Branch: |
0232 232-BSBI BATON ROUGE |
Customer: |
|
Job: |
|
Erect Date: |
02/02/2021 |
Dismantle Date: |
12/02/2021 |
Job Description: |
PTP-7 |
Loc Desc: |
N/S Pipe Rack along Amines |
Business Group: |
Projects |
Area: |
Site Wide |
Unit: |
EEO |
Scaffold_Type: |
Safway Systems |
Client: |
Performance |
PO Number: |
288065 |
WO Number: |
N/A |
Starting Elevation: |
0 |
Scaf Size Desc: |
|
Num Decks: |
0 |
Base LegFt: |
240.00 |
Total Pieces: |
0 |
Total Weight: |
0 |
Activity Date | Activity | Status | Employee | Length | Width | Height | Special Notes |
---|---|---|---|---|---|---|---|
02/02/2021 | Erect | Red | Jeff Gunnells | 23.00 | 9.00 | 30.00 | |
11/17/2021 | Inspect | Red | Jeff Gunnells | ||||
11/17/2021 | Inspect | Red | Jeff Gunnells | ||||
12/02/2021 | Dismantle | Red | Jeff Gunnells |